Insights · Quoting & supply

How fast can you get a CNC machining quote in the UK?

Last reviewed: 9 July 2026

The short answer

Milltech typically returns a precision CNC machining quote within 24–48 hours of receiving your drawings and requirements, supported by Tricorn® ERP and Edgecam® CAM. Send a drawing, material, quantity and finish, and you get a competitive price and realistic lead time from a Norwich subcontractor established in 1999.

Quote speed is one of the first things buyers judge a subcontractor on — a slow quote signals a shop that isn't in control of its schedule. Here is how fast a precision CNC machining quote should be, and how to get an accurate one quickly.

How fast can you get a CNC machining quote?

From a well-run UK subcontractor, expect a quote within 24–48 hours of sending your drawings and requirements. Milltech quotes in that window, supported by its Tricorn® ERP system, which gives real-time visibility from quotation to invoice, and Edgecam® CAM, which lets the team prove programmes and price complex parts quickly.

Very intricate multi-part assemblies can take a little longer to estimate precisely — but a straightforward machined part should never take a week.

What information does a machinist need to quote a part?

The faster and more complete your enquiry, the faster and tighter the quote. Include:

  • A drawing or CAD model (2D or 3D both work).
  • The material (or the environment the part must survive, if you want advice).
  • The quantity, and whether it repeats.
  • Any tolerance or finish requirements.
  • Your target lead time.

With those in hand, a subcontractor can price the part and commit to a realistic delivery date.

Why do some quotes take longer?

Complexity is the variable. Multi-part assemblies, exotic materials, special plating or painting, and very tight tolerances all need more process planning. This is where a CAM system earns its place — Edgecam® strategy management lets Milltech produce and prove programmes exceptionally quickly, which keeps even complex quotes inside a sensible turnaround.

How do you get a quote from Milltech?

Send your drawings, material, quantity and finish through the quote form or by email. Milltech's team reviews it and returns a competitive price and lead time — typically within 24–48 hours — for anything from a single prototype to a production programme.

FAQ

Frequently asked questions

How fast can you get a CNC machining quote?

A competitive UK subcontractor should return most quotes within 24–48 hours of receiving your drawings and requirements. Milltech quotes in that window; more intricate multi-part assemblies may take a little longer to estimate precisely.

What information do you need to quote a machined part?

Ideally a drawing or CAD model, the material, the quantity (and whether it repeats), any tolerance or finish requirements, and your target lead time. The more complete the information, the faster and more accurate the quote.

Why do some CNC machining quotes take longer than others?

Complexity drives it — multi-part assemblies, unusual materials, special finishing or very tight tolerances need more estimating and process planning. A CAM system such as Edgecam® speeds this up by proving programmes quickly.

Can you quote from a CAD model as well as a drawing?

Yes. A 2D drawing or a 3D CAD model both work; a model can speed up programming and estimating for complex geometry.

How do you get a quote from Milltech?

Send your drawings, material, quantity and finish through the contact form or by email, and Milltech's team returns a competitive quote and lead time — typically within 24–48 hours.

Your project — our precision

Start your project

Send your drawings, quantities and materials. Our team returns a competitive quote and lead time — typically within 24–48 hours.